- Helmrig was selected by a major Civil Engineering contractor to complete the clearance of trees and vegetation on a former munitions factory
- Total area 100 Acres
- Over 1000 tonnes of woodchip, 500 tonnes of timber and 300 tonnes of root material was processed on site.
- Arisings were then removed from site and used to generate renewable energy.
- The whole site was then “mulched” to remove roots, brambles and small vegetation to enable construction to begin.